Holiday relaxation is everywhere around, but not at our construction sites. We are not slowing down and the project, which we are implementing in the “turnkey” formula – upgrade of the Fuel Terminal in Piotrków Trybunalski – is progressing according to schedule.

The construction of fire-fighting tanks pump station has been completed, and currently intensive works are underway in the scope of roads and rail to enable the acceptance of a train with start-up fuel, which is scheduled to arrive on August 16. At the railway unloading facilities, we have installed the ZB System, developed by our own designers, which protects from falling employees working on rail tankers. At the same time, we have supervised the corrosion protection works of above-ground tanks, electrical and instrumentation works as well as we have installed pipelines and technological equipment.

We have been working at full capacity to ensure that the fuel terminal is operational already this fall.

Main EPC Contractor: KB Pomorze Sp. z o.o.

Investor: LOTOS Terminale S.A.