Construction of the LNG tank in Świnoujście

Utworzone: 27 January 2022

Third LNG storage tank with a capacity of 180,000 cubic meters is built at the Świnoujście LNG terminal, as part of the LNG Terminal Expansion Program. KB Pomorze participates in this impressive investment as mechanical subcontractor. Our scope includes fabrication and assembly of the tank structure, as well as comprehensive hydrostatic and pneumatic tests. The steel dome of the tank consists of elements weighing 34 tons each and dimensions of 40m x 10m. For the works, a crane with a height of 142 m and a lifting capacity of 800 tons is used. The general contractor of the investment is the consortium of PORR S.A. (consortium leader) and TGE Gas Engineering. Investor: GAZ-SYSTEM S.A.