Sea loading terminal T1 - Naftoport

We have built, as General Contractor, loading station T1 in the sea loading terminal “Naftoport” in the North Port in Gdańsk. As a result of the investment it is possible to unload up to 200 tankers with a capacity from 1 500 to 50 000 DWT per year. The position has been equipped with automatic systems for control, measurement, installation of fire and exhaust fumes separator cleaning rainwater and residue installation.