On 17.08.2022 trains with fuel entered the Piotrkow Trybunalski fuel terminal construction site, which means that our project has entered the next stage – the commissioning phase. Fuel from the rail tankers was unloaded at the rail supply facility and then pumped into the storage tanks. At the same time, we began checking the operation of technological installations (including filling and receiving equipment, pumping stations), in order to prepare the investment for acceptance by the investor and authorities.

Main EPC Contractor: KB Pomorze Sp. z o.o.

Investor: LOTOS Terminale S.A.