Progress at construction site in Piotrków Trybunalski

Utworzone: 18 May 2022

Over the past month, the landscape at the Fuel Terminal construction site has changed significantly – the ground tanks for diesel oil are beginning to rise above the terminal, while the LPG tanks have already been buried and insulated ester storage tanks have been installed on the site. The weather on May is favorable for the timely completion of construction works in all branches and we are optimistic about conducive conditions until the end of the project.

Main EPC Contractor: KB Pomorze Sp. z o.o.

Investor: LOTOS Terminale S.A.